Mobile inspection app for the Gas Boiler Law

  • Fully compliant with BRL 6000-25 and associated NEN and NPR standards
  • Pair your Eurolyzer S1 with Incontrol: readings directly in the report
  • One app, one work process, instantly correct report
Try 14 days for free
Master the field

Mobile inspection app for the Gas Boiler Law

Try 14 days for free
  • Fully compliant with BRL 6000-25 and associated NEN and NPR standards
  • Pair your Eurolyzer S1 with Incontrol: readings directly in the report
  • One app, one work process, instantly correct report

More than 15,000 companies have gone before you

View all our customer stories
Incontrol-client-Dutch-Energy-Group-logo-NL
Incontrol-client-Kuijpers-logo-NL
Incontrol-client-ITN-logo-NL
Incontrol-client-E-Control-logo-EN
Incontrol-client-ADS-inspection-logo-NL
Incontrol-client-Wouda-logo-NL
Incontrol-client-DVT-advice-logo-NL
Incontrol-client-Bam-logo-NL
Incontrol-client-of-empel-2-logo-NL
Incontrol-client-Mossink-logo-NL
Incontrol-client-EKCN-logo-NL
Incontrol-client-AET-Energy-logo-NL
Incontrol-custom-major-electrotechnology-logo-NL
Incontrol-client-Actemium-logo-NL
Incontrol-client-solarbox-logo-NL
Incontrol-client-Loohuis-logo-NL
Incontrol-client-Electropartners-logo-NL
Incontrol-client-Endenburg-logo-NL
Incontrol-Customer-From-Hees-logo-NL

The Incontrol app: everything you need, always in your pocket

Incontrol-speed-icon-NL

Work faster.

Start inspecting immediately using one smart template for the Gas Boiler Act. No startup time, no hassle.

Incontrol-bonnet-icon-NL

Work more efficiently.

Are you measuring with a Eurolyzer S1? Link it directly via Incontrol Sync. Your readings will automatically appear in your report. No Eurolyzer S1? Then simply enter them manually.

Incontrol-check-file-icon-NL

Work more accurately.

Measure, photograph and record in one flow. Everything comes directly into the report - error-free and complete.

Report-for-the-Gasket Act

What is required by the Gas Boiler Act is standard in your report

Your report is built automatically during the inspection. Everything you record comes in - neatly structured and ready for inspection.

  • Measurement results are automatically transferred - including CO, CO₂, O₂. Do you have a Eurolyzer S1? Then the values are read in automatically.
  • Device data, serial and type numbers.
  • Visual inspection of gas combustion appliance, flue gas outlet and setup room
  • Any deviations and remedial actions with photos and explanations
  • Including company logo, date and signature

No loose attachments, no manual typing. Everything is in the right place - according to BRL 6000-25.

Correctly measuring, error-free reporting

An inspection report according to the Gas Boiler Act stands or falls with reliable measured values. In Incontrol, you enter them easily - manually or automatically. Are you using a Eurolyzer S1? Then your measurement results are immediately added to the right place via Bluetooth. No mistakes, no hassle.

  • Bluetooth connection with Eurolyzer S1

  • Automatic data transfer to the right field

  • Works error-free and speeds up your work on site

Gas boiler law-connecting-with-the-Eurolyzer
Step-By-Step

No separate apps. One streamlined inspection process.

Everything happens in one flow: you record device data, measure, photograph and note deviations; all directly in the final report. Completely according to BRL 6000-25, without post-processing

  • One process, step by step: error-free and logical

  • Everything is processed directly in the final report

  • Completely according to the structure of BRL 6000-25

Your report, professional and ready to send immediately

Upon completion, the report is provided with your company logo, date and digital signature. No formatting or exporting in Word. One click, and you have a professional document that meets the requirements of BRL 6000-25.

Atex-sample-report-of-Incotnrol

Master the field with Incontrol!

Incontrol-audit-icon-NL

According to standardization

Work fully in accordance with BRL 6000-25 and the associated NEN and NPR standards. Updates in regulations are automatically reflected in your forms.

Incontrol-security-icon-NL

Security & compliance

Designed for use in high-risk environments. Incontrol complies with ISO 27001, is fully AVG-proof and supports the requirements of the NIS2 directive.

Incontrol-check-icon-NL

Successful audits

Reports meet the requirements of external auditors such as Kiwa, Bureau Veritas and other certified bodies. Everything traceable, readily available.

Incontrol-photo-editing-icon-NL

Adding & editing photos

Easily add and edit photos and include them in the report.

Incontrol-photo-plane-icon-NL

Available online & offline

Work wherever and whenever you want on laptop, tablet or smartphone in your own digital environment.

Incontrol-photo-signature-icon-NL

Digital signing

Sign forms with a legally valid digital signature.

Follow up on defects?

Arrange direct follow-up with Incontrol.FIX

During a BRL 6000-25 inspection, you come across defects that require immediate follow-up: leakage, contaminated burner, high CO value, defective fan. With Incontrol.FIX you register these directly, centrally and in a structured manner - including device type, location, measurement data and photos.

You get a complete overview of all recorded defects. You see what is still open, what has already been fixed, and you can assign actions to technicians or teams. This way you work flawlessly, traceable and ready for audit or re-inspection.

  • Complete overview of all faults per customer, boiler type or region

  • Prioritize and plan repair actions directly from your inspection report

  • Shareable status lists and reports for customers or clients

Closed-loop-Incontrol.FIX

Start reporting digitally, too!

background image

The most frequently asked questions

Yes. The app is designed based on the standards described in InstallQ's BRL 6000-25.

The Gas Boiler Act does not only apply to central heating boilers. Any plant with a gas combustion process that can generate carbon monoxide and is listed in the BRL 6000-25 is covered by the law.

Examples of gas combustion systems covered by the law:

  • Geysers
  • Gas stoves
  • Gas stoves
  • Gas boilers
  • Gas-fired air heaters
  • Gas fired swimming pool heaters
  • Gas-fired appliances and machinery (such as generators, pumps, industrial plants)

No. Everything you enter during the inspection - measurements, device data, photos and comments - is automatically incorporated into the final report. Including your logo, date and digital signature. The report is immediately ready to send according to BRL 6000-25.

Immediately upon completion. The report is automatically compiled based on what you recorded.

Yes. During the inspection, you can continue measuring, taking pictures and entering data offline as usual. Once you are connected again, everything is automatically synchronized

These include the Eurosyzer S1. Other devices can be paired via Incontrol Sync

You receive a professional ATEX inspection report as a PDF in your own house style, including photos, classifications and digital signature.